Set up a project's work breakdown and organization structures, control accounts, work packages, custom fields, resources and rates, and check that it is ready for planning.
Work Breakdown Structure
The Structure Designer builds the WBS and the OBS as governed hierarchies, or applies a default structure to start, so scope and responsibility are defined before planning begins.
Define each work package's scope, basis of estimate, assumptions and constraints, plan its estimate timing, and see whether it is ready for detailed planning.
Work Package Basis of Estimate
Each work package carries its scope statement, deliverable intent, SOW or requirement references, estimating method, BOE narrative, assumptions and constraints, and gap filters show which packages are still missing them.
Control Accounts and Work Packages
Control accounts sit at the intersection of the WBS and the OBS, and work packages beneath them carry the earned value method, budget authorization and charge mapping, so schedule, cost, resources and actuals share one set of scope boundaries.
Import a Microsoft Project file by choosing which data to bring in, mapping its fields to the project structure and reviewing everything before a single apply.
MS Project Structure Mapping
Import maps Microsoft Project fields onto the WBS, OBS, control accounts and work packages, with a preview tree, a choice for each ambiguous code and a list of unmapped tasks, all reviewed before anything reaches the plan.
Work Package Timing
Before detailed activities exist, place each work package by offset from a contract-award or notice-to-proceed anchor, or by absolute dates, and drag to adjust, so the BOE has a time-phased shape early.
Requirements Traceability
RoadmapOn the roadmap: requirements traceability that connects stakeholder needs to the work packages that satisfy them, so teams can confirm the planned scope covers what matters.